How Long Does It Take To Install Suspended Ceilings In Brookvale?

Suspended ceilings have been boosting the aesthetic appeal of office and residential spaces for many years. However, many property owners refrain from having these structures installed in their spaces as they think the process costs a lot of time and money. However, professional installers of suspended ceilings in Brookvale can complete the project in a few days, depending on the scope of the project. For instance, adding suspended ceilings to a 150-square-foot room takes only two to three days. 

Assessing the Project

Before installing suspended ceilings, installers first measure the room’s dimensions. Accurate measurements are key to accurately designing the suspended ceiling grids. Other factors that installers consider during this stage include - 

  • Aesthetic features of the room where the ceilings are being added. 

  • The presence of wires, cables, and other fittings that need to be incorporated into the suspended ceilings. 

  • If the property owner wants tiles on top of the suspended ceilings, the installers will have to measure the thickness and sizes of the tiles. 

  • Soundproofing requirements of the property owner. 

  • Hygiene-related requirements.

  • Creation of fire separation routes.

  • Addition of corrosion-resistant layers on the ceilings. 

  • The addition of thermal insulation features. 

After assessing the dimensions and these features, the installers measure the rooms’ perimeters. They do so to ensure the drop of the ceiling is perfectly suited for the ceiling grid. Then, they start adding false ceilings. 

  • The secondary ceilings are suspended from brackets fixed to the floor slab or existing ceilings’ bases. 

  • A range of interlocking metal sections combines to form the grid. This grid absorbs the weight of the new ceilings. They ensure the grid is concealed. 

  • After fitting the grid, the installers add other structures inside the new ceiling. Lighting, speakers, HVAC equipment, air conditioning cables, etc. – any item can be concealed within these ceilings.

  • Lastly, tiles are added within the frames and the project is complete. Adding tiles to the frame doesn’t take much time. However, sourcing specific types of tiles can take a lot of time. For instance, property owners who want their suspended ceilings to make their rooms soundproof want acoustic baffles to be added to the frame. 

Sourcing these special tiles may take some time. Hence, the owners need to share these requirements with their installers in advance.  Overall, property owners can expect this process to last for one and a half or two days. Professional installers of suspended ceilings in Brookvale study the job site in advance to ensure there are no surprises the day they start the project. 

Adding Partitions

After installing suspended ceilings, many property owners have partitions installed. Similar to suspended ceilings, these partitions add space, convenience, and definition to residential and commercial spaces. They can be easily integrated with suspended ceilings. This installation process may take one or two additional days. This combination transforms the rooms, making them more spacious and structured. 

After completing the installation process, property owners must spend some time to check the safety measures. For instance, the suspended ceilings must have fire separation routes.