How Long Does It Usually Take To Renovate A Bathroom In Mona Vale


If you talk about renovating an average bathroom, it usually takes up to 6 weeks to complete. But if you plan to have your bathroom renovations in Mona Vale Vale, then be prepared to spare at least 10-12 weeks for all the modern designing and things. However, suppose you are getting involved in bathroom renovations. In that case, there are many things that you need to plan beforehand to avoid undesirable situations and circumstances. 


Here is the list of things that you should be following :


  • Select and finalize the design. There are many things that you must look forward to when designing or renovating a house. These include the finalization of many tiles, shower type, fittings, vanity, bath, and the basins that you need to finalize even before the process starts.

  • You have to get a framework ready first. Once the framework is prepared, you are all set to begin the work.

  • Framing is one of the essential things when it comes to renovating a bathroom. A proper framed layout will give you a clear picture of how your new and modern bathroom is going to look like and aid the laborers. 

  • You must install the wiring set-up and piper for sanitation. Suppose you pre-plan this stage like deciding upon fittings of showerheads, taps, basins, etc.. In that case, it will reduce the chances of end-moment hassle.

  • You should focus on getting tiled flooring. This will not only give a dramatic look to your bathroom but will also help in improving the longevity of the furniture.

  • Plastering is an integral part of any bathroom renovation. You will have to give at least a couple of days to the plastering process and a couple of more for it to dry out and settle ultimately.

  • You will require screeding only when you are willing to have a walk-in shower. Or even those who aren’t using a shelf with poly marble. 

  • A usual off the shelf cabinet will be ready to install almost immediately. But if you are planning on getting a tailor-made wardrobe, then only the process of getting the cabinet ready will take at least 4-6 weeks. This will add up to your overall renovation procedure. 

  • The process that takes the longest when it comes to bathroom renovations in Mona Vale is the tiling. It has to be done at the last when all other things are settled, and all the fittings portion has been taken care of. Also, an important decision related to what type of tiling you want is to be taken beforehand. The types may include ceramic, natural stone type, vinyl, etc.

  • Fittings of the equipment like basins, toilet-pot, bathtubs, etc. All the work related to electrician and plumbing has to be completed at this stage.

  • Post this, it is now time to set the mirrors and glasses all across the bathroom when required. Needless to say, it is essential to keep work-related to drinks, and mirrors should be undertaken at the last when the entire process is on the verge of getting completed because of the obvious reasons.

  • Then comes the painting, if required.

  • Lastly, your contractor will ask the laborers to do the cleaning.


I hope this consolidated list of things you should be considering whenever you are planning to get a bathroom renovated in Mona Vale will guide you through. 

 