What Are The Different Steps Of Concreting?

concreter kings langley, concreting kings langley

As you would know, concrete is a material that is used for the process of construction. It is made by using raw materials such as cement, water, and aggregate that is made up of materials such as gravel or sand. At times, other materials are used for this purpose as well.

You need to maintain the proper proportion of these materials:

1) Batching:

The first step of concreting in Kings Langley is batching. It is the process where you measure various materials that you need to make the concrete. This includes the likes of cement, sand, coarse aggregate, and water. There are two ways in which batching can be done – weight batching and volume batching. In volume batching the concrete materials are measured based on volume. In the case of weight batching the batching work is done by way of weight.

2) Mixing:

This is the second process in this particular regard. In these cases, the necessary materials are mixed in a detailed manner.

The Concreter in Kings Langley mixes them in the necessary proportions. This is done until the time the paste shows that it is consistent in terms of consistency and colour. There are two ways in which such mixing can be done. They are hand mixing and machine mixing. If you want to get the best possible quality, in this case, you should first mix the materials in dry conditions and after that, you should mix them in wet conditions.

3) Transportation:

This follows the process of mixing:

At this stage of concreting in Kings Langley, the concrete that has been made freshly is transported to the site where the construction is being done. However, this can only be done when the mixing has been done the right way. Once transported the concrete is placed correctly in the formworks. There are two ways in which such can work be done. They are mechanical transportation and manual transportation.

4) Compaction:

This is the process whereby air bubbles are removed from the concrete that has been placed freshly. This is an important part of the process because it increases the ultimate strength of the concrete. It enhances the bond by using reinforcements.

Thus, as you can see, how important compaction is in the context of the work that is being done by a concreter in Kings Langley.

5) Curing:

This is the final step in this particular process. In this case, the concrete is made to retain its moisture for a specific time so that the process of hydration can be completed. You need to do such work the right way so that the concrete can be made stronger. If you are using ordinary sulphate resistant cement it should take you 8 days to get the job done. If you are using low heat cement it would require you 14 days.

Conclusion:

When you are going to get concreting in Kings Langley done at your home or business property, these are a few things that you need to keep in mind. Make sure that you carry them out the right way.